The M8TRIX model utilizes a prefabricated structural system, using the advantages of pre-fab with the quality of steel frame construction. This is the backbone of design for all Z Life's new-build developments.
Prefabricated structural walls are built off-site, using less manpower and environmentally-controlled conditions.
Majority of the structural components can be built before ever breaking ground, accelerating the site build timeline.